Baghjan’s high-pressured gas well was finally capped by successfully placing the BOP at the well head after a long struggle of 83 days. The well capping operation by the alert team was assisted by the crisis management teams of OIL, ONGC and Schlumberger. Placing the BOP successfully atop the well head was quite a challenging task for the team considering its sheer weight and the risky working environment.