The subsea production system for Petrobras’ Mero 1 project will be supplied by Norway’s Aker Solutions. The subsea production system, which will consist of 12 vertical subsea trees, will be manufactured at the São José dos Pinhais and Rio das Ostras facility. The Norwegian energy service company is already working on the project, with deliveries scheduled for 2020. The subsea production system will be hooked up to Guanabara FPSO.