Fetching News Details
Aker Solutions has secured a letter of intent from Equinor for the topside work on the Troll B and C platforms offshore Norway to reduce the CO2 emissions. Modifications include installation of equipment for receiving electrical power from shore via cable. This will replace power generation from gas turbines at the platforms, and thus reduce climate footprint. Scheduled for completion at the end of 2025.