American E&P firm, Noble Energy has contracted Maersk Drilling's Valiant for the work offshore Colombia. The contract is valued at $18.2m and is expected to be concluded in 65 days. Noble said that the contract fees also includes mobilization and demobilization services. The 2013-built Maersk Valiant is Maersk Drilling’s seventh-generation drillship and comes equipped with integrated managed pressure drilling (MPD) capabilities.