Japanese offshore floating platform supplier, MODEC International has secured the FEED contract for Woodside Energy’s SNE Field Development Phase 1 floating production storage and offloading (FPSO) facility. The total capacity of the FPSO is estimated to be 100,000 bbl/day, with first oil expected in 2022. The design of FPSO will be carried out in a way that it allows the integration of subsequent SNE development phases.