Fetching News Details

Sinopec teams up with Zhejiang
Aug. 23, 2018

Sinopec teams up with Zhejiang

Sinopec Corp has joined hands with Zhejiang Energy Group Co Ltd for LNG terminal in east China. It is an agreement of 3 million tonne-per-year whose first phase is set for operation at end-2021. 4 tanks with a capacity of 200,000 cubic meters of LNG each, a berth of capacity 30,000 cubic meters to 266,000 cubic meters and a 26-km pipeline, these are included in the project.

⬅ all news

Please Login to Save News for Later