Sinopec Corp has joined hands with Zhejiang Energy Group Co Ltd for LNG terminal in east China. It is an agreement of 3 million tonne-per-year whose first phase is set for operation at end-2021. 4 tanks with a capacity of 200,000 cubic meters of LNG each, a berth of capacity 30,000 cubic meters to 266,000 cubic meters and a 26-km pipeline, these are included in the project.