Sound Energy bagged the production concession for the Tendrara gas discovery in Morocco. Sound Energy will carry out drilling operations for 5 new horizontal development wells and redevelop the existing TE-6 and TE-7 wells. The project also includes construction of a gas treatment plant and compression station. A 120 kilometre gas export pipeline will also be laid to link the station with Gazoduc Maghred Europe pipeline.